Scrum Team Bundle – 1

Scrum Team Bundle - 1, Sprint Planning, Template, Three Template


Excel Template Bundle 1 


Combination of Three Template with a Bundled price for Scrum Team Bundle – 1

  1.  Capacity & Sprint Planning in Scrum Team Bundle – 1:

    This Scrum bundle team – 1 Template is prepared for Plan your Scrum team capacity and optimize your commitment during Sprint Planning. This Scrum Bundle team – 1 is designed for the scrum team, who estimate their capacity in hours, and during sprint planning distribute the story into small subtasks and assign them to team members and validate the team member’s allocation and estimation is in sync with their capacity.

    There are 5 Sheets to capture the information. You will get the details of the sheet from the Details tab. below mentioned the list of Tabs you will,

    1. Definition
    2. Analytics
    3. Capacity
    4. Sprint Planning
    5. Estimation Accuracy

    You will get 6 different templates as below:-

    9 Member Template (for 2 weeks and 3 Weeks sprint) – Two Template
    15 Members Template (1 week to 4 weeks) – Four  Template

  2. Sprint Planning Summary in Scrum Team Bundle – 1:

    This is a raw template to prepare your Sprint Planning summary report. Check the sample report as a product image for reference
    Key Sections

    1. Sprint Goal
    2. Sprint Duration
    3. Sprint Schedule
    4.  Capacity Utilization Summary
    5. Task Hour Distribution
    6. Commitment Summary
    7. Committed Story details
       
  3. Scrum Metrics in Scrum Team Bundle – 1 :

    This Template is prepared to create and manage Scrum Metrics and KPIs. See more details below.

    Available Metrics
    1 Commitment Reliability Shows the percentage of story points completed against its commitment for every sprint. With Trend record among last 6 completed sprints.
    2 Capacity Utilization Represent the team capacity in hours and committed hours for each sprint, measured in effort hours. With Trends among the last 6 sprints
    3 Velocity Represents the total number of story points completed each sprint, with trend analysis for the last 6 sprints.
    4 Velocity Fluctuation Represents the velocity variance from average with relation to max and min tolerance.
    5 Scope Change Sprint over Sprint, for the Last 6 sprints, the amount of story points added to the sprint or amount of story points removed from the sprint, After the Sprint Started.
    6 Defect Leakage Amount of Defects detected after development, You can calculate it as defects detected by the development team vs. defects detected by the Product Owner / or UAT.
    7 Effort Estimation Variance Effort estimated vs. actual shows Overestimation hours and underestimation hours
    8 Backlog Health Shows the health of backlog in as a total number of Story Points available in backlog Vs Average Velocity (last 6 months). The speedometer shows the current backlog health is below 1 time of Average Velocity, at least 1 time of Average velocity, at least 2 times of average velocity or more than 3 times of average velocity.

Price

Original price was: ₹7,850.00.Current price is: ₹6,250.00. + Tax

Enquire Now

You May be Interested in

Shopping Cart
Scroll to Top