Scrum Team Bundle – 3

Scrum Team Bundle - 3

Excel Template Bundle 3 


Combination of Four Template with a Bundled price

1. Capacity & Sprint Planning :

This Scrum Team Bundle – 3 –  Template is prepared for planning your scrum team capacity and optimizing your commitment during Sprint Planning. This Scrum Team Bundle – 3 is designed for the scrum team, who estimate their capacity in hours, and during sprint planning distribute the story into small subtasks and assign them to team members and validate the team member’s allocation and estimation is in sync with their capacity.

There are 5 Sheets to capture the information. You will get the details of the sheet from the Details tab. below mentioned the list of Tabs you will,

  1. Definition
  2. Analytics
  3. Capacity
  4. Sprint Planning
  5. Estimation Accuracy

You will 6 different templates as below

9 Member Template (for 2 weeks and 3 Weeks sprint) – Two Template
15 Members Template (1 week to 4 weeks) – Four Template

2. Sprint Planning Summary :

This is a raw template to prepare your Sprint Planning summary report. Check the sample report as a product image for reference
Key Sections

    1. Sprint Goal
    2. Sprint Duration
    3. Sprint Schedule
    4.  Capacity Utilization Summary
    5. Task Hour Distribution
    6. Commitment Summary
    7. Committed Story details

3. Scrum Metrics :

This Template is prepared to create and manage Scrum Metrics and KPI. See more details below.

Available Metrics
1 Commitment Reliability Shows the percentage of story points completed against its commitment for every sprint. With Trend record among last 6 completed sprints.
2 Capacity Utilization Represent the team capacity in hours and committed hours for each sprint, measured in effort hours. With Trends among the last 6 sprints
3 Velocity Represents a total number of story points completed each sprint, with trend analysis for the last 6 sprints.
4 Velocity Fluctuation Represents the velocity variance from average with relation to max and min tolerance.
5 Scope Change Sprint over Sprint, for Last 6 sprints, the amount of story points added to the sprint or amount of story points removed from the sprint, After Sprint Started.
6 Defect Leakage Amount of Defects detected after development, You can calculate it as defects detected by the development team Vs Defects detected by the Product Owner / or UAT.
7 Effort Estimation Variance Effort estimated Vs Actual shows Overestimation hours and underestimation hours
8 Backlog Health Shows the health of backlog in as a total number of Story Points available in backlog Vs Average Velocity (last 6 months). The speedometer shows the current backlog health is below 1 time of Average Velocity, at least 1 time of Average velocity, at least 2 times of average velocity or more than 3 times of average velocity.
4. Capacity Planning, Sprint Planning, and Tracking for two Week Sprint

This Template is prepared for planning your scrum team capacity and Plan your Sprint and Track it as part of sprint execution This is designed for the scrum team, who estimate their capacity in hours, and during sprint planning distribute the story into small subtasks and assign them to team members and validate that the team members’ allocation and estimation are in sync with their capacity.

There are 11 Sheets to capture the information. You will get the details of the sheet from the Details tab. below mentioned the list of Tabs you will,

1 Team Define the Team Name and Focus Factor
2 Current Sprint Sprint Name and Cadence
3 Holiday List The list of Holidays falls under the sprint duration
4 Ceremony Time Capture the time for each ceremony or planned meeting
5 Team Member Team Member’s Name, Role, and their allocation % to the Project
6 Individual Vacations Capture individual planned vacation time.
7 Default Sub Tasks Possible Subtask the team will be working on
8 Task Flow Status Status of subtask in their from start to end
9 Task Status treat as Done Last status of the task workflow
10 Starting Task Status First Status pf the workflow
11 Stories to Plan List of initial stories to be planned, for quick population

Limitations

Team Members x 15
Sprint Sudation 2 Weeks
Holiday Rule Team Holiday Override – Individual Holiday
Sub Tasks Max 10
Status of Subtasks Max 10
User Stories to Auto Populate with Sub Task Max 25
Max row of Tracking including Story and Subtask Max 225

 

Price

Original price was: ₹15,650.00.Current price is: ₹9,000.00. + Tax

Product Quantity

Capacity and Sprint Planning

1

Sprint Planning Summary

1

Scrum Metrics

1

Capacity Planning, Sprint Planning and Tracking - 2 Weeks Iteration

 

 

1

Enquire Now

You May be Interested in

Shopping Cart
Scroll to Top